TOTALLY WICKED FACTORY

GROUNDWORKS, DRAINAGE, SURFACING AND MODULAR BUILDING PACAKGE

 

During this project, Bee Smart Sevices Ltd was contracted to carryout all required groundworks, construction and landscaping during the installation of a set of double storrey modular offices and labratories to extend the Totally Wicked premesis in Blackburn. We were the first trade on site carrying out a soil strip and bulk excavation before installing sheet piles to form a retaining wall. we then installed pad foundations and drainage followed by surfacing and timber and rock cladding to the retaining wall. please see the list of activities carried out below:

  • Bulk excavation and reduced level excavation to over 4m deep

  • Installation of pad foundations

  • Installation of sheet pile retainaing wall

  • Installation of gabion retaining basckets

  • Installation of cedar cladding to sheet piles

  • Installation of foul and surface water drainage

  • Installation of service ducts

  • Installation of tarmac surfacing

  • Installation of steel and polycarbonate canopy

  • Installation of render and copings

  • Installation of post and rail timber fencing

  • Installtion of paalisade fencing

  • Any many more..