Crofton academy was a contract awarded by Portakabin to design and install all required structure, services and landscaping to a new modular building constructed on a lower tennis court to the rear of Crofton academy. The works involved forming and access ramp onto a tennis court an demolision of the existing tennis court. we then installed a full drainage package and pad foundations. once the building had been installed, we completed resin bound gravel paths, planting and grass seeding. Below is a more detailed list of the groundwork and landscaping services completed on the project:
-
Planning existing tennis court to generate capping and subbase material.
-
Removal of weld mesh fencing.
-
Instalation of earth and plannings ramp
-
Reduced level excavation
-
Excavation and installation of concrete pad foundations
-
Installation of lift pit base
-
Installation of new water feed
-
Installation of foul and surface water systems
-
Installation of new electrical feed
-
Installation of foul pumping system
-
Installation of tarmac paths
-
Installation of resin bound gravel path
-
Installation of brick work
-
Render to brick work
-
Installation of shrubs
-
landscaping
-
Before work starts
Before work starts
-
Completed modular building
Completed modular building
-
Installation of building
Installation of building
-
Pad foundations
Pad foundations
-
Phase 1 complete
Phase 1 complete
-
Planed off surface of tennis court
Planed off surface of tennis court
-
Setting out
Setting out
-
temporary ramp
temporary ramp
-
View the embedded image gallery online at:
http://beesmartservices.co.uk/index.php/portfolio/6-crofton-academy-modular-build#sigProIdc2b4ebd5b4








http://beesmartservices.co.uk/index.php/portfolio/6-crofton-academy-modular-build#sigProIdc2b4ebd5b4